BIM consultancy

OUR BIM CONSULTANCY BIM SERVICE ORIENTED TO ALL THE AEC SECTOR COMPANIES, KEEPS AN APPROACH BASED ON FOCUSING THE IMPROVEMENT OF THE PERFOMANCE OF THE ENTERPRISE. ITS IMPLEMENTATION ONLY MAKES SENSE IF IT INCREASES THE CONTROL OVER THE PRODUCTION OR DURING THE WORKS PROCESS. THE BIM IS NOT AN END IN ITSELF, BUT A METHODOLOGY THAT NEEDS TO INCREASE THE RETURN AND THE FINAL QUALITY OF THE PRODUCT OR THE BUILDING.
ARXPROJECT IS A MEMBER OF THE BUILDING SMART SPANISH CHAPTER, AN ASSOCIATION WHOSE MAIN OBJECTIVE IS TO PROMOTE EFFICIENCY IN THE AECO SECTOR THROUGH THE USE OF BIM STANDARDS TO ACHIEVE NEW LEVELS OF REDUCING COSTS AND EXECUTION TIMES AND INCREASING QUALITY.

BIM implementation

WE OFFER YOU A COSTUMISED BIM IMPLEMENTATION, EITHER THROUGH SOME PROCESSES OR ON ANY SPECIFIC PROJECT THAT IT’S REQUIRED. TODAY THE BIM IS INCREASINGLY AN INDISPENSABLE REQUIREMENT FOR THE PUBLIC CALL OF TENDERS AND FOR MANY PRIVATE PROJECTS. WE WILL FIND THE STRATEGY THAT BEST SUITS TO YOUR COMPANY AS THAT DEMAND OF THE USE OF BIM . ENCONTRAREMOS LA ESTRATEGIA QUE MEJOR SE ADAPTE A TU EMPRESA PARA QUE ESA EXIGENCIA BIM BECOMES EFFICIENCY AND RETURN OF THE INVESTIMENT.

Custom BIM strategy

BIM Balaced Scoreboard

Customized modeling tools

Specific training courses

Our challenge is to ensure an efficient and direct implementation. Carrying out an analysis of the processes and specific needs, we design a personalized roadmap, which will be constantly reviewed to reduce the transit time as much as possible and obtain the return on investment as soon as possible. BIM is a methodology open to adaptation, but its implementation does not make sense if it does not have a consequence in cost savings, either through saving resources, or through the reduction of times in the project or working phases. In addition, each company has its own reasons for implementation, as well as its needs for software and customized tools that allow it to enhance the advantages of working in BIM. It is our main objective to detect and implement them in an agile way. 

project modeling

THE BIM REQUIREMENTS TO PARTICIPATE IN A PROJECT OR A TENDER MAY SEEM A SETBACK OR EVEN AN IMPEDIMENT FOR MANY COMPANIES. THAT'S WHY OUR TEAM WORKS WITH THEM TO SOLVE THIS CHALLENGE FOR THEM IN AN AGILE WAY AND WITHOUT HINGERING THEIR USUAL WAY OF WORKING, WITH THIS SPECIFIC ISSUE.

Requirements and BEP analysis

Audit and review of models

As-built model developing

Technical support for modeling

At arxproject we have always focused on services to bussines and therefore we know that the requirement of a BIM model nowadays can be a burden that needs to be solved correctly to respond  in terms of qualit. But in these cases the efficiency and the resources savings in general are essential. The scrupulous checking of the BIM Execution Plan (BEP) by our BIM Managers is what makes us comply all the project requirements, but also that we do not overdo it wasting time and money on it. We adapt our work to any type of software, Autodesk Revit, Inventor, Navisworks, Solibri, Solidworks…and we handle many visualization tolos such as 3d Studio Max, Sketchup o Enscape that helps us to explain the Project to those skateholders without a technical profile.

scan to BIM

SURVEY USING LASER TECHNOLOGY ALLOWS US TO OBTAIN THE POINT CLOUD WITH WHICH WE RAISE A DIGITAL TWIN. IT IS AN IMPORTANT TOOL TO ACHIEVE FLUENCY IN THE DEVELOPMENT OF A PROJECT ON AN EXISTING BUILDING. THE PRECISION OBTAINED GUARANTEES THAT THE MODEL WITH WHICH WE WORK IN THE OFFICE IS EXACTLY THE SAME AS THE REAL BUILDING ON WHICH THE WORK WILL BE DONE.

Point Cloud

3D Laser Scan

End of works as-built

Photogrammetry

Within the BIM work environment, the term Scan to BIM is linked to any project that starts from a more or less complex existing asset. With 3D laser measurement technology, data is quickly collected and a point cloud is obtained with an accuracy that far exceeds any traditional survey. Combined with the model, this point cloud allows us to work from the office on the real state of the space. This data collection system is even used to monitor the progress of a work, to know precisely what its final result should be or even to audit it through an as-built once it is finished.

BIM Support for Companies

WE KNOW THAT THE IMPLEMENTATION OF BIM IS AN ONGOING PROCESS AND REQUIRES COLABORATION IN ORDER TO BE FLUENT. THAT IS WHY WE OFFER OUR PEOPLE KNOWLEDGE FOR THOSE MOMENTS IN WHICH IT IS COMPLICATED TO ADVANCE AND IN THE MOST COMPLEX PARTS WHICH YOU ARE NOT ABLE TO REACH.

Pluggins y add-ins design

Customized modeling tools

BIM libraries, families and templates.

Training and BIM manuals

Despite we are sure that the  the benefits outweigh the effort, we are also aware of the difficulties of work with BIM. In most of the situations the external support is required, either timely or continuously. If our client could need specific tools for software optimizing, or find the way to automate those repetitive processes that require a lot of resources or just look for those improvements that helps to reduce cost and time, our experience in different programming languages compatible with the BIM software is essential. Phyton, C#, C++, Ruby, Dynamo, API de Revit, Grasshopper…these are complex tolos but its understanding enables us to make a quantitative and qualitative leap forward to future ways of construction project management. 

BIM coordination

THE COORDINATION OF THE MODELS IS ONE OF THE MOST IMPORTANT ADVANTAGES THAT THE BIM METHODOLOGY PROVIDES TO OUR WORK. THERE IS A DIGITAL CONSTRUCTION MODEL THAT JOINS THE MODEL OF EACH STAKEHOLDER, WITH WICH WE CAN DETECT ACCURATELY ALL THE CLASHES AND SOLVE IT, DESIGN THE WORKS PLANNING AND PHASES AND CONTROL THE BUDGET. AT THE SAME TIME, WE CAN EXPECT FUTURE WORKING SITE PROBLEMS.

Clash detection and analysis

Services and structure calcultation

Construction digital twin

4D and 5D project modeling

Traditionally, the coordination of the proposals of each discipline on the work site involved in taking a chain of decisions that produced planning and budget imbalances. BIM allows us to resolve clashes and avoid conflicts. In that sense, there are different dimensions that reaches to 7D. The fourth dimensión (4D) adds the time factor to the model, allows us to relate each of the components with each works’ stage, so the planning is included inside the model. In the same way the fifth dimension (5D) adds the cost factor and generates the budget. The 4D and the 5D help us to evaluate the consquence in terms of time or money of each change and take the decisión on the coordination process previously to the begining of the construction of the building.

Utilizamos cookies propias y de terceros para realizar el análisis de la navegación de los usuarios y mejorar nuestros servicios. Si continúa navegando, consideramos que acepta su uso. Puede obtener más información, o bien conocer cómo cambiar la configuración, pulsando en Más Información